“Providing innovative rail solutions”

To improve passenger flow for the DLR platform 9 at Bank station, a cross passage that had been previously sealed and converted to a cleaners store and locker room, was reinstated back into an adit (cross passage). The cleaners store and locker room had to therefore be relocated and to achieve this, an existing mess room was converted into a locker room with mess facility, and separate cleaner’s cupboard.


Works undertaken on this M&E project included lighting, power, air conditioning, mechanical ventilation and installation of fire dampers.


In addition, a hot and cold water system and drainage was installed to both the new mess / locker room and the cleaner’s cupboard.


In the adit, the main sump pump control panel and associated power supply had to be relocated and new cross passage lighting installed, so that the reinstated cross passage matched the existing passages.





Projects


Bank DLR Station - Adit Reinstatement

Overview


      Home      About Us      Services       Projects      Contact Us

    Home      Contact      Staff Log In

Solution Rail Limited © 2015

All rights reserved. Terms and Conditions

Chesham


Solution Rail_Projects_Chesham

Ruislip Depot -  Train Refresh


Solution Rail_Projects_Ruislip Train

SSL Pre-Asset Stabilisation Surveys


Solution Rail_Projets_SSL Surveys

Bank DLR


Solution Rail_Projects_Bank

Ruislip Depot -  Road 38


Solution Rail_Projects_Ruislip Road 38

TfL Offices - Electrical Surveys

Solution Rail_Projects_TfL Offices Solution Rail_Projects_Chesham Solution Rail_Projects_Ruislip Train Solution Rail_Projects_Bank Solution Rail_Projets_SSL Surveys Solution Rail_Projects_Ruislip Road 38 Solution Rail_Projects_TfL Offices Solution Rail_Projects_Waterloo Depot Solution Rail_Projects_Oxford Circus

Oxford Circus DNO Power Supply

Solution Rail_Projects_TfL Offices

Waterloo Depot - Train Wash Screen

Solution Rail_Projects_TfL Offices

Go Back


FS 558770